Product questions? Let’s talk.

Book a call
Engineering tools · application support

Size it. Select it. Send it for review.

Turn application details into a clearer preliminary result, then send the complete calculation or selection path to Collins Sales without retyping the project.

Available now 13

interactive sizing and selection experiences

4 engineering calculators
9 guided selection tools
Sizing & selection library

Start with the application.
Leave with a next step.

Every tool provides preliminary guidance and a direct handoff to Collins Sales. Results never confirm pricing, stock, availability or delivery.

Available nowSizing guide

Hi-vis coverall sizing

Match waist and chest to the supplied coverall chart, identify the listed regular or tall code, and flag custom-made or fit-review conditions.

Electrical PPEHi-visWorkwear
Open coverall guide →
Available nowSizing guide

Rubber-glove sizing

Use palm circumference to prepare a preliminary whole-size and colour token while keeping voltage class and the complete part number under review.

Insulating glovesPalm sizePPE
Open rubber-glove guide →
Available nowRuntime estimator

Home backup runtime

Build a planned essential-load profile and compare the preliminary nominal runtime for one to four Electrafy battery modules.

Essential loads1–4 modulesHome backup
Open runtime estimator →
Available nowGuided design

Lighting design & layout studio

Choose the room, finishes, colours and lighting intent, then compare verified ORTECH LED families and generate a preliminary fixture grid and room concept.

ResidentialCommercialIndustrial
Open lighting studio →
Available nowSizing calculator

Transformer sizing & part number

Calculate single- or three-phase kVA from voltage and current, then match the next listed Jefferson catalog size.

480 V600 VJefferson
Open transformer calculator →
Available nowGuided RFQ

LV and MV transformer request

Prepare a review-ready transformer application covering ratings, primary and secondary systems, enclosure, environment, accessories and testing.

Low voltageMedium voltageTransformer RFQ
Open transformer request →
Available nowSelection guide

Surge protection selector

Build a preliminary SPD strategy from installation location, amperage, exposure, enclosure and electrical system.

SPDkA rangeApplication
Open SPD selector →
Available nowGuided checklist

Meter selection checklist

Combine application, electrical-system, sensing, communications, mounting and project details into one review-ready meter brief.

MeteringPower monitoringApplication
Open meter checklist →
Available nowEngineering calculator

PFC resonance check

Estimate required correction, resonance order and capacitor or tuned-filter harmonic current from system data.

PFCResonanceHarmonics
Open PFC calculator →
Available nowEngineering calculator

HCU correction sizing

Use a VFD schedule or measured system current and TDD to estimate preliminary harmonic and reactive correction.

VFD scheduleTDDHCU
Open HCU calculator →
Available nowGuided RFQ

Thermon application centre

Build a review-ready design brief for electric or steam pipe tracing, vessels, tube bundles, roof and gutter systems, or custom Powerblanket heating.

Heat trace6 applicationsSales handoff
Open Thermon RFQ centre →
Available nowGuided specification

HD cable-reel specification

Document drag, lift, stretch or retrieve duty, environmental conditions, mechanical data, electrical requirements and cable length.

Cable reels4 applicationsLength total
Open cable-reel guide →
Guided product-line selection

Tell us what the job needs.

The selector narrows the Collins line card to relevant manufacturer families. It does not replace final application review or create a pricing or stock commitment.

123
Your selection path

Choose the application details.

The result will identify relevant Collins product lines, official resources and the next information to confirm.

A consistent Collins handoff

One workflow for every tool.

Future manufacturer guides will join this library only after their official rules, source tables and limitations are validated.

01

Enter application data

Use actual nameplate, system or project information where available.

02

Review the preliminary result

See the calculation basis, assumptions, warnings and recommended next details.

03

Send it to Collins Sales

Add your contact information once. The complete result creates a Salesforce lead and notifies the sales team.

Planned next

Manufacturer-validated guides

EV site planning and enclosure selection tools can be added through the same controlled framework.

No guessed formulas.
No guessed part numbers.