Product questions? Let’s talk.

Book a call

Power & energy meters · guided application checklist

Turn meter questions into a review-ready brief.

Combine the electrical system, sensing method, mounting, data, communications and I/O requirements in one place—then send the completed application to Collins Sales.

01ApplicationPurpose and metering points.
02ElectricalVoltage, current and system.
03FeaturesSensing, data, comms and I/O.
04ReviewConfirm the complete brief.

Eaton meter application checklist

Describe what the meter must do.

The questions combine the supplied Collins meter checklist and meter-type interview guide. Every field begins blank and conditional details appear only when needed.

01

Project context

Contact details are collected once after the technical checklist is reviewed.

02

Meter application

Define the measurement purpose and whether the project is single-point or multipoint.

Primary meter purpose *
Metering arrangement *
Leave blank if the requirement is not yet known.
03

Electrical system

Use one-line, nameplate and conductor information where available.

System phase *
Meter power source *
04

Current sensing

Define the sensing device, core style, current ratings, accuracy and secondary signal.

Measurement device *
Core construction *
05

Mounting and display

Describe how the meter will be installed, protected and viewed.

Meter mounting *
Enclosed meter required? *
Integrated web interface required? *
06

Data and communications

Define onboard history, waveform capture and the protocols the meter must support.

Onboard data logging required? *
Number of days.
Waveform recording and display required? *
Meter communications required? *
Communication protocol or medium *
Describe the protocol when “Other” is selected.
07

Inputs and outputs

Document required digital, analog, pulse and relay points without assuming an Eaton I/O module.

Digital I/O required? *
Analog I/O required? *
WAGES pulse monitoring required? *
WAGES utilities *

Application review

Requirements first. Current product data next.

Electrical suitabilityConfirm system configuration, metering category, control power and sensing ratios.

Features and integrationConfirm display, logging, waveform, protocol and I/O requirements against current Eaton options.

Commercial detailsPricing, stock, availability and delivery are supplied only after Collins Sales reviews the application.

Explore Eaton metering ↗