Heavy-duty cable reels · guided specification

Build a cable-reel brief that is ready for review.

Document how the reel moves, where it operates, what the cable carries and how much cable the application needs—then send the completed specification to Collins Sales.

01ApplicationDrag, lift, stretch or retrieve.
02EnvironmentTemperature, sealing and hazards.
03ElectricalConductors, ampacity and voltage.
04ReviewConfirm the complete specification.

Lind cable reel specification

Describe the complete operating duty.

The questions follow the supplied Lind checklist. Every field begins blank; conditional details appear only when they apply.

01

Project context

Contact details are collected once after the technical specification is reviewed.

02

Application

Choose the reel motion and describe how the cable interacts with the equipment.

How will the reel be used? *

Include a photo, sketch or drawing during follow-up if the cable path or mounting is difficult to describe.

03

Environmental data

Describe where the cable reel will be installed and used.

Operating environment *
Corrosive materials present? *
Hazardous location? *
04

Mechanical data

Document cycling, equipment speed, payout direction and cable-path devices.

Powering moving equipment? *

At 20,000 or more cycles per year—or in an unusually harsh environment—the supplied checklist notes that premium cable may be required.

Used to annualize the hourly cycle rate without assuming continuous operation.
Used only to compare the entered duty with the checklist's 20,000-cycle annual reference.
Cable payout direction *

The supplied checklist notes that payout more than 15° from parallel may require a swivel base or swing mount.

05

Electrical data

Use actual nameplate and conductor requirements where available.

Checklist reference: single-phase applications typically use three conductors including ground, and three-phase applications typically use four. U.S. frequency is normally 60 Hz. Confirm the actual nameplate and installation requirements.

06

Cable length needed

Add the application lengths. Stretch sag allowance is calculated exactly as printed on the supplied checklist.

Difference between minimum and maximum operating payout.
Cable outside the reel at minimum payout.
Distance from cable lay-up to reel location.
Length needed for connections at the free end.
10% of active plus inactive length.
Connected to the non-rotating side and reported separately. It is standard on some reels and supplied by the customer on others; Collins/Lind must confirm.
Checklist total—Choose an application and enter the required lengths.
07

Supporting information

Indicate what can be supplied after Collins Sales responds.

Available supporting material

Supporting files are requested separately. Supporting material can be supplied through the agreed business channel after the Collins team replies.

Application review

The specification is the start of the selection.

Duty and mechanicsLind confirms spring, reel geometry, payout, mounting and cycle requirements.

Cable and environmentConductor, cable, enclosure and hazardous-location requirements remain subject to engineering review.

Commercial detailsPricing, stock, availability and delivery are supplied only after Collins Sales reviews the application.